The bridge between the port and your factory
For exports, an empty container is brought to your factory, loaded and taken to the port; for imports, a full container is collected from the port and delivered to your warehouse. This is the road leg of sea freight, and doing it on time is critical to make vessel cut-offs and avoid port demurrage.
When you choose "Container" as the vehicle type on Navlum, your request is shown to companies with container chassis. You can get more accurate offers by adding the container size, port name and vessel cut-off date in the notes field.
Container20' and 40' (incl. HC)
ConnectionPort ↔ factory / warehouse
CurrencyTRY (domestic)
What to include in your request
- Container size and type (dry, high cube, open top, reefer)
- Port or terminal name and the loading / unloading address
- Vessel cut-off date or the date the container must be collected from the port
- Approximate gross weight and any special conditions (ADR, overweight)
Tip: Mentioning details such as the port appointment system or terminal rules in the notes field makes planning easier for companies and reduces waiting costs.